General industrial ventilation

Supply outdoor air and exhaust indoor air to manage heat and air movement across a production space.

Where it fits

In a warm production hall, the useful question is where fresh air travels between the inlet, workers and exhaust. A supply close to an exhaust can leave little circulation at a workstation. A survey of heat sources and occupied areas helps establish a workable air path.

  • Heat removal in a production hall
  • Replacement air for a building with several extract points
  • Ventilation changes after a plant layout or shift change

How it works

  1. Identify the loads

    Map equipment heat, occupied areas, existing exhaust and openings. Record which processes and doors are active during a representative shift.

  2. Distribute and remove air

    Supply and exhaust locations establish the flow path through the space. Winter operation may require heating the replacement air.

  3. Review the operating modes

    Compare occupied and idle periods and the effect of other exhaust equipment. Where a task releases hazardous dust or fume, assess capture at its source.

Planning a project

  • Which areas are too hot, stagnant or drafty, and when?
  • What process exhaust, doors or other air supplies change during the day?
  • Send the floor plan, ceiling heights, heat sources and known supply or exhaust duties.

Related systems

Technical references

Discuss this system with Ponka

Tell us about the task, the operating schedule and the conditions at your site.

Discuss your project