Ventilation & HVAC / PFD-02

Industrial building HVAC

Outdoor air, filtration, heating, and cooling coordinated around the needs of a defined plant space.

Process flow diagram

PFD-02 ORIGINAL DRAWINGEnlarge drawing ↗
PFD-02: original Ponka process flow diagram for Industrial building HVAC.
Ponka Engineering Alliance · Custom Air Systems Engineering (2018) Full sheet, p. 4 ↗

Reading the drawing

Outdoor air enters at the left and passes through its own filter. A second duct brings air back from the room along the top of the drawing. Manual dampers set the mix before the air passes through the main filter and the HVAC unit, where the coils heat or cool it and the fan sends it back to the room. The small outward arrow marks air leaking out of the room.

Mining applications

Supplying and conditioning plant air

Processing facilities contain rooms with very different air and temperature requirements. This arrangement serves a defined space using an air-handling unit, filtered outdoor air, and a controlled return-air path. Local capture remains a separate consideration wherever a process releases dust or fumes.

Control and operations rooms beside mineral processing areas
Enclosed equipment support spaces with defined temperature requirements
Plant service buildings assessed for suitable return-air operation
Typical operating steps for this application
  1. Introduce outdoor air

    A filtered intake supplies the outdoor-air portion of the system.

  2. Manage the air mixture

    Mixing dampers balance outdoor and permitted return air. Return-air suitability depends on the room contaminants and intended use.

  3. Filter and condition

    The main filter section and heating or cooling coils prepare air for the space.

  4. Distribute and monitor

    Supply ductwork delivers air while temperature and room-pressure indication support adjustment and operation.

Main components

ComponentRole in the system
Outdoor-air filter box ↗Filters air entering from the outdoor intake.
Mixing dampers ↗Set the outdoor and return airflow proportions.
Main filter box ↗Provides the selected filtration stage before conditioning.
Air-handling unitCombines air movement with heating and cooling.

Linked components open the VentilationComponents.com supplier catalogue. Equipment selection forms part of the system engineering.

Before equipment selection

What to discuss with Ponka

  • Define occupants, equipment heat loads, room contaminants, and operating schedules.
  • Evaluate whether any return air is appropriate; filtration alone does not establish suitability.
  • Coordinate supply air with local exhaust, adjoining rooms, and outdoor-air quality.

Related systems

Industrial building HVAC · PFD-02

Open image at full resolution ↗Enlarged original PFD-02 process flow diagram

Discuss this system with Ponka

Tell us about the material, operating conditions and problem you need to address.

Discuss your project